Legal Office Case Study

15% reduction in HVAC equipment energy use from tools to maximize unoccupied time and range. Equipment Issue Intelligence identified two equipment issues over 6 months. Root cause of both was rooftop HVAC equipment control board failures.
Single Story Office Case Study

From October 26, 2022 to March 20, 2023, the HVAC equipment runtime minutes totalled 47,091. When compared to a 72 degree hold, this is a ~38% decrease in runtime. The majority of the decrease was from the front hallway equipment, which operated ~15x more than the open space.
Research & Development Lab Case Study

From October 26, 2022 to March 20, 2023, +25% energy savings across all spaces, including a tricky Sit Lab space where comfort was difficult prior to installing sensors.